Jordan Compact - Water Infrastructure
Summary: MCC’s $273 million Jordan Compact (2011-2016) contained three projects: the $88.6 million Water Network Project (WNP), the $75.8 million Wastewater Network Project (WWNP), and the $97.8 million As-Samra Expansion Project (AEP). It aimed to increase the supply of water to households and businesses through improvements in the efficiency of water delivery, the extension of wastewater collection, and the expansion of wastewater treatment in Zarqa Governorate. The projects aimed to stimulate economic growth by reducing the cost of water and the cost of supplying it (both borne by the utility) and by reducing household expenditure on non-utility water.
Study Type: Independent Evaluation
Study Status: Completed
?
views
views
?
downloads
downloads
Loading...
Loading...
This study has no related knowledge products.
This product has no downloadable files.