Ghana Power Compact - ECG Financial and Operational Turnaround (EFOT)

?
views
?
downloads

Loading...

General Metadata

  • Contractor: Mathematica
  • Sector: Energy
  • Intervention Type(s): On-grid power infrastructure; Technical assistance
  • Cross-Sector Theme(s): policy and institutional reform
  • Project Objective:

    To improve the quality and reliability of electricity through reduced outages and cost-effective service delivery by ECG, reduce aggregate technical, commercial and collections losses, and ensure ECG can serve as a creditworthy and credible offtaker under power purchase agreements. 

Evaluation Methodology

  • Evaluation Type: Performance
  • Evaluation Methodology Type: Pre-Post
  • Location Type: Urban

Milestones

  • Contract Start: September 2017
  • Evaluation Design Report Published: August 2019
  • Interim Report Published:
  • Final Data Package Published: September 2025
  • Final Report Publication: September 2025

This study has no related knowledge products.

This product has no downloadable files.