Armenia Compact - Water to Market Post-Harvest Processing

?
views
?
downloads

General Metadata

  • Contractor: Mathematica
  • Sector: Agriculture and Irrigation
  • Intervention Type(s): Producer Organizational Development
  • Cross-Sector Theme(s): value chain
  • Project Objective:

Evaluation Methodology

  • Evaluation Type: Performance
  • Evaluation Methodology Type: Ex-post thematic analysis
  • Location Type: Rural

Milestones

  • Contract Start: March 2011
  • Evaluation Design Report Published: August 2011
  • Interim Report Published:
  • Final Data Package Published: June 2013
  • Final Report Publication:

This study has no related knowledge products.

This product has no downloadable files.